July 9, Chuxiong Yi nationality autonomous prefecture of Yunnan Yao ‘ an County the magnitude 6 earthquake. Earthquake occurs, Kunming electric supervision Office immediately to grid dispatching Center, Chuxiong, Yunnan power supply Bureau earthquake in Yunnan, Dali power supply Bureau and Chuxiong, Dali area power grid security power supply impacts of. After the earthquake, immediately organized coordination groups rushed to the disaster area in Yunnan power grid company, Chuxiong related emergency power supply Bureau in time to start.
the earthquake Yao ‘ an County electric power co, Ltd of a 10,000-volt line trip, some buildings cracked Muding County power supply company, wall tilt; Binchuan County Electric Power Co Ltd a 35,000 volt line trip, Xiangyun County power company two 10,000-volt line trip. Tripping line has 35,000 volts to the 9th power has been restored, Xiangyun County power company two 10,000-volt tripping line was 9th power has been restored, as of 10th, Yao ‘ an County part of the affected villages in Chuxiong Prefecture has not recovered power supply.
in master the earthquake related situation Hou, Kunming electric prison Office timely will related situation to national electric prison will and South electric prison Council for reported, while on Chuxiong power supply Bureau made regulatory requirements: a is to strengthening factory network coordination, serious scheduling discipline, reasonable arrangements run way, ensure Chuxiong grid run of security reliable; II is strengthening on damaged facilities of monitored,. increased monitoring of frequency, prevent secondary disaster of occurred; three is as soon as possible organization power emergency emergency team, Under the unified leadership of the local people’s Governments emergency command, ordered recovery of affected areas supply; four is to ensure the smooth flow of information submitted. Reach out to the local people’s Government power damages and repairs reported after the quake-stricken area, carried out the rescue operation, will be submitted to Kunming electricity regulatory Commission of service restoration in disaster areas in a timely manner.